![](/img/cover-not-exists.png)
[IEEE 2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO 2013) - Hammamet (2013.4.28-2013.4.30)] 2013 5th International Conference on Modeling, Simulation and Applied Optimization (ICMSAO) - A new lower bound for minimising the total completion time in a two-machine flow shop under release dates
Chalghoumi, Sabrine, Mrad, Mehdi, Ladhari, TalelYear:
2013
Language:
english
DOI:
10.1109/ICMSAO.2013.6552646
File:
PDF, 66 KB
english, 2013