![](/img/cover-not-exists.png)
No-wait scheduling of a two-machine flow-shop to minimise the makespan under non-availability constraints and different release dates
Ben Chihaoui, Faten, Kacem, Imed, Hadj-Alouane, Atidel B., Dridi, Najoua, Rezg, NidhalVolume:
49
Language:
english
Journal:
International Journal of Production Research
DOI:
10.1080/00207543.2010.531775
Date:
November, 2011
File:
PDF, 190 KB
english, 2011