Preliminary conceptual design and cost estimation for SFR...

Preliminary conceptual design and cost estimation for SFR Fuel Manufacturing Facility (SFMF)

Ko, Won Il, Lee, Ho Hee, Choi, Sungyeol, Kim, Ki Hwan, Kim, Sung-Ki, Park, Byung Heung, Lee, Hyo Jik, Kim, In Tae, Lee, Han Soo
How much do you like this book?
What’s the quality of the file?
Download the book for quality assessment
What’s the quality of the downloaded files?
Volume:
277
Language:
english
Journal:
Nuclear Engineering and Design
DOI:
10.1016/j.nucengdes.2014.06.026
Date:
October, 2014
File:
PDF, 1.99 MB
english, 2014
Conversion to is in progress
Conversion to is failed