IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems
2012 / 11 Vol. 31; Iss. 11
![](/img/cover-not-exists.png)
TRECO: Dynamic Technology Remapping for Timing Engineering Change Orders
Kuan-Hsien Ho,, Jiang, J. R., Yao-Wen Chang,Volume:
31
Language:
english
Journal:
IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems
DOI:
10.1109/tcad.2012.2201480
Date:
November, 2012
File:
PDF, 5.36 MB
english, 2012