![](/img/cover-not-exists.png)
The Study on the Water Immersing Time Impact over the Concrete Anti- Compression Strength with Rock-Drilling Method
Zhang, Jin YangVolume:
137
Language:
english
Journal:
Applied Mechanics and Materials
DOI:
10.4028/www.scientific.net/AMM.137.144
Date:
October, 2011
File:
PDF, 273 KB
english, 2011