![](/img/cover-not-exists.png)
Building a low cost “High Rate Facility”: a case study of how the Metropolitan Sewer District of Greater Cincinnati has increased wet weather capacity with minimum investment
Lu, Ting, Welsh, Ryan, Shaw, Andy, Reed, Scott, Linn, DonaldVolume:
2013
Language:
english
Journal:
Proceedings of the Water Environment Federation
DOI:
10.2175/193864713813667935
Date:
January, 2013
File:
PDF, 469 KB
english, 2013