![](/img/cover-not-exists.png)
Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand
M-C Wu, L-C Huang, H-M Hsu and T-S SuVolume:
62
Language:
english
Journal:
The Journal of the Operational Research Society
DOI:
10.2307/20868949
Date:
June, 2011
File:
PDF, 1.24 MB
english, 2011