DISCUSSION. ACCOUNT OF THE BRIDGE OVER THE GORAI RIVER, ON THE GOALUNDO EXTENSION OF THE EASTERN BENGAL RAILWAY.
LESLIE, B, BARRY, J W, FOX, F, BROWNE, J, BERKLEY, GVolume:
34
Language:
english
Journal:
Minutes of the Proceedings of the Institution of Civil Engineers
DOI:
10.1680/imotp.1872.22874
Date:
January, 1872
File:
PDF, 1.14 MB
english, 1872