![](/img/cover-not-exists.png)
Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand
Wu, M-C, Huang, L-C, Hsu, H-M, Su, T-SVolume:
62
Language:
english
Journal:
Journal of the Operational Research Society
DOI:
10.1057/jors.2010.39
Date:
June, 2011
File:
PDF, 238 KB
english, 2011