Part I: A resource estimation based on mineral system...

  • Main
  • 2018 / 2
  • Part I: A resource estimation based on mineral system...

Part I: A resource estimation based on mineral system modelling prospectivity approaches and analogical analysis: a case study of the MVT Pb-Zn deposits in Huayuan district, China

Li, Nan, Xiao, Keyan, Sun, Li, Li, Shengmiao, Zi, Jianwei, Wang, Kun, Song, Xianglong, Ding, Jianhua, Li, Cangbai
How much do you like this book?
What’s the quality of the file?
Download the book for quality assessment
What’s the quality of the downloaded files?
Language:
english
Journal:
Ore Geology Reviews
DOI:
10.1016/j.oregeorev.2018.02.014
Date:
February, 2018
File:
PDF, 1.11 MB
english, 2018
Conversion to is in progress
Conversion to is failed