A Method for Determining the Groups of Road Segments to be Simultaneously Constructed, the Priority Between Them and Construction Pattern Considering the Disutility Under Construction.
Tanoue, Hiroshi, Kiyota, Masaru, Chisyaki, Takeshi, Sumi, TomonoriYear:
1998
Journal:
Doboku Gakkai Ronbunshu
DOI:
10.2208/jscej.1998.604_1
File:
PDF, 1.27 MB
1998