![](/img/cover-not-exists.png)
Comparison of job shop production scheduling by using the non-delay method and the Heijunka method at PT XYZ
Kulsum,, Muharni, Y, Pratiwi, A SVolume:
673
Journal:
IOP Conference Series: Materials Science and Engineering
DOI:
10.1088/1757-899x/673/1/012089
Date:
December, 2019
File:
PDF, 732 KB
2019